A continually developing CRS policy

Every year Santanderina carry out quality, safety and environmental audits to ensure the company is developing responsibly. Santanderina study each process in the cycle carefully, making investments to promote energy saving, introduce infrastructure improvements (machinery, auxiliary equipment, etc.) and allow us to ensure sustainability.

Since 1989, Santanderina has had its own industrial waste water treatment plant.

The ecogeneration plant is one of the best tools for saving energy and keeping to the necessary carbon dioxide (CO2) emission limits.

SANTANDERINA HAS ACHIEVED:

A cleaner production

Better waste management

Resources optimisation

Internal recycling project

CONTROL

  • PERIODIC CONTROL OF THE EMISSIONS TO THE ATMOSPHERE.
  • PERIODIC CONTROL OF THE CHEMICAL PRODUCTS IN ORDER TO GUARANTEE THAT THEY DO NOT ENTAIL ANY RISK FOR HUMAN HEALTH.

MANAGEMENT

  • MANAGEMENT OF THE HAZARDOUS WASTE AND NON HAZARDOUS WASTE GENERATED.
  • REDUCTION IN THE GENERATION OF SLUDGE AND IMPROVEMENT OF THE ENERGY EFFICIENCY OF SANTANDERINA’S ECOGENERATION PLANT.
  • 755,279 M3 OF WASTEWATER TREATED (AFTER BEING TREATED, WATER HAVE BEEN SENT TO THE WASTEWATER TREATMENT PLANT IN THE AREA).

INVESTMENTS

  • MACHINERY ECOLOGICAL INVESTMENTS: NEW MERNINGER DIMENSA MERCERIZING MACHINE AND NEW UNITOP CAUSTIC SODA RECOVERY AND REUSE EQUIPMENT.

RENEWALS AND NEW CERTIFICATIONS

  • RENEWAL OF THE ISO 14001: 2004 CERTIFICATE.
  • OEKO TEX STEP NEW CERTIFICATE.